top of page

Panzer II “Luchs” - Weeks 28-52

Update Week 28-52 "Interior Coming Together". Luchs from Samur on Left Alpha on Right


Access panel to engine


Lubrication system for the swing arms and torsion bars


Start of placing the internal storage in the floor and flooring


Tons of little boxes in the floor


Offset on the wall to hold the 80 watt and MWEC umformer


Verbandkasten on top and 80 watt unformer mount under


Flooring from Panzer Farm


Cold weather starter reservoir on rear wall "Omega"


Layout "Alpha"


Boxes


Mp40 Holder


Spent 2cm mag box holder


Fuse for radios


Atemschlauch behind the drivers seat, a fire extinguisher also goes here.


Flooring layout of Omega


80 watt transmitter cover holder


EUA4 umformer holder, gurtsack for the Mg34, Mp40, MG spare parts


Making floor handles


More work, this box is for the 2cm Flak gun spares.


Coming together


Boxes and weapons spares (Mg34 MG Werkzeuge on the wall, MG 34 Zubehor on floor)


Layout


Omega layout progressing


Tool box goes here


Mg spares parts on wall, MG parts on floor, tool box on drive shaft cover and 2 cm spare parts on floor


Oil reservoir for the Fv432 steering box


Fire wall goodies


MWEC receiver box


The Luchs had a special radio mount to go up front


Welding into place


Newly made dashes


Looks good here


Dash in place, 2nd dash for Oil and Temp


MWEC in place, 80 watt will go to the left of the radio operator, mounted on the roof and housing cover for drive shaft.


Finished product with gauges in place, the drive shaft cover and area will get an aluminum housing like the original to hide these bits.


Some storage on Bovington's Luchs


Some storage on Bovington's Luchs


Some storage on Bovington's Luchs, you can see the lubrication system on the wall, same as Alpha and Omega


Drive shaft cover and storage box attachments, plus the rotary junction box for electric and radios.




Comments


© 2020 by Panzerfabrik

bottom of page