Panzer II “Luchs” - Weeks 28-52
- Randy, Panzerfabrik
- Oct 30
- 2 min read
Luchs update on the torsion bars, swing arms and wheel hub assemblies. Week 28 through 52, some of the first pictures are from earlier build dates, just to tie the torsion bar system into the new hub assemblies and wheel assemblies...

Here the torsion bar sits in its anchor on the opposite side of the hull.

These clunky things will be the actual swing arms. 2" wide material they are heavy. If I could do it again I would make them lighter. I think these would hold a King Tiger.

These will accept the torsion bar on the swing arm side and provide the attachment location for the swing arms. I've lost sleep over these because they are a Panzerfabrik design.... which means we are out in creativity land with a margin for "oops".

On the inside. The broched collar to the right is where the opposite torsion bar will terminate and anchor.


Swing Arm Hubs made by ISM, they did a great job on turning these out. They were over our capabilities here so we leaned on our favorite machine shop.

Wheel assemblies designed by Panzerfabrik, built by Panzer Farm

Hub assemblies, things of beauty.

Newly produced wheel hubs.

Packing the swing arms

Talking shop

Completed swing arm

Swing arm and wheel hub assembly.

These weigh a pretty penny, don't hurt your back.

The boss is even in on this

Wack, wack, wack

Looking pretty

Driving in the torsion bar

Getting there. This is my good side, get a few pics.. Luchs 1.0 looking on..at his new litter mates.

Swing arms installed, now for the wheel hub assemblies.

Newly made wheel hub assemblies, made by Panzer Farm

I likey..

You can see the offset wheel stations.

Driving in the bearings.

More assemblies going on.

Waiting for the wheels to be finished.. Currently out getting rubber..They should be done anyday.








Comments